Company Profile
 
Products
Customers
 
 

  • Totally Integrated Engineering Data Analysis and Knowledge Management environment. 
  • Improved Teamwork, engineering analysis skill and productivity.
  • The systems work for you.  Team members can then focus on results and interpretation to make the right decisions.
  • Maximum personal efficiency through analysis preferences and real time information sharing.  Work smarter, not harder.
  • Optimal Engineering Data Analysis productivity.  Interactive solutions coupled with personal job scheduling and global Batch analysis maximizes your EDA systems' potential.


The Reality...

Start Experiment trails or Pilot production
 


- Simple design due to time pressure or limited statistical analysis techniques.
Regularly check lot status for holds, issues, split or data analysis requirements

- time consuming to check daily.
- news distributed or not always available

Reaches WAT & perform key change parameter analysis, no concerns


- extract time is consuming
not all checks are comprehensive

Restart lots, modify Yield Roadmap


- Yield Ramp delayed
- Wasted people / material resources
Perform Failure Analysis to determine a known existing in-line event was root cause!

- Wasted FA effort
- Reactive mode

Reaches Wafer Sort and split inconclusive / panic due to low yields


- Alarm / concern
- Analysis distraction





The Future with TYNE...

Start Experiment trails or Pilot production
 


+ KM system guides through Experiment design and starts documentation
Inform KM system of split needs, analysis requirements & risks


+ one time activity
+ proactively plan success criteria / risks / roadblocks

Reaches split point, KM system automatically informed you 2 days before
 

+ resources arranged
+ real time documentation
Reaches CP; KM starts analysis; informs engineer & YE team

+ No surprises & Timely analysis.
+ Proactive environment allows time for expert interpretation and direction setting.

KM system notifies engineer of Pilot WIP inline event

+ Event information available instantly
+ Restart experimental lots immediately, minimize project impact.
Reaches WAT; KM starts Data analysis; informs engineer

+ Automatic analysis of all parameters
+ Statistically based
+ Time spent on interpretation of the expected changes & unexpected issues!




Page 01 of 02


TYNE Systems Corporation.
TEL:+886-3-5726781 FAX:+886-3-5737833